VDOT News - Hampton Roads

RELEASE:

CONTACT:
IMMEDIATE

Hampton Roads Public Affairs 757-956-3032
[email protected]

HRO-206314

Oct. 27, 2023



HAMPTON ROADS WEEKLY LANE CLOSURES REPORT OCTOBER 29 TO NOVEMBER 4
Closures on Water Crossings, Interstates, and Other Notable Detours

NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges.
*Scheduled closures are subject to change based on weather conditions and other factors.*
For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511.

Bridges and Tunnels:

Hampton Roads Bridge-Tunnel, I-64:

  • Mobile, single-lane closure westbound Oct. 31 from 9 p.m. to 5 a.m. 
  • Single-lane closure eastbound Nov. 1-2 from 9 p.m. to 5 a.m. 

Monitor-Merrimac Memorial Bridge-Tunnel, I-664: 

  • Alternating, single-lane closures northbound Oct. 29 to Nov. 2 from 9 p.m. to 5 a.m. 
  • Alternating, single-lane closures southbound Oct. 31 from 9 a.m. to 2 p.m. 

High Rise Bridge, I-64:

  • Single-lane closures eastbound Nov. 2 from 8 p.m. to 5 a.m. 

Berkley Bridge, I-264: 

  • Double-lane closures westbound Oct. 29 and Nov 3-4 from 7 p.m. to 5 a.m. 

James River Bridge, Route 17: 

  • Single-lane closures southbound Oct. 30 from 9 a.m. to 12 p.m. 
  • Brief, intermittent stoppages in both directions Oct. 31 from 9 a.m. to 2:30 p.m. 

George P. Coleman Bridge, Route 17: 

  • Brief, intermittent stoppages in both directions Oct. 31 from 9 a.m. to 12 p.m. 

HRBT Expansion Project:

  • For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org.

Elizabeth River Tunnels (Downtown/Midtown Tunnels):

  • Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164).

I-64, Southside Widening, High Rise Bridge Expansion:

I-64, Hampton Roads Express Lanes:  

Hampton: 

  • Long-term, continuous single-lane closure on I-64 in both directions, reducing travel lanes from three to two lanes between Settlers Landing Road/Woodland Road (exit 267) and LaSalle Avenue (exit 265), with I-64 west traffic shifted to the I-64 east lanes. View the full traffic alert here

Norfolk, Reversible Roadway: 

  • Full closure in both directions:
         - Oct. 30 to Nov. 1 from 9:30 a.m. to as late as 12:30 p.m.
         - Nov. 2-3 from 8 p.m. to 3 a.m. 

I-95, Sussex County: 

  • Full closure of I-95 south between Route 40/Sussex Road (exit 31) and Route 301/Blue Star Highway (exit 17) Oct. 29 from 6 p.m. to 7 a.m. View the full traffic alert here.
  • Full closure of the on- and off-ramps to/from I-95 south and Route 645/Owen Road (exit 24) Route 631/Henry Road (exit 20) Oct. 29 from 6 p.m. to 7 a.m.   
  • Full closure of I-95 south between Route 645/Owen Road (exit 24) and Route 301/Blue Star Highway (exit 17) Oct. 30 to Nov. 1 from 6 p.m. to 7 a.m.   
  • Full closure of the on- and off-ramps to/from I-95 south and Route 631/Henry Road (exit 20) Oct. 30 to Nov. 1 from 6 p.m. to 7 a.m.  

Other Notable Closures:

Route 17, York County: 

  • Brief, intermittent stoppages on Route 17 in both directions between Matthews Street to Goosley Road Oct. 29 to Nov. 2 from 7 p.m. to 5 a.m. 

(END)



Information in VDOT news releases was accurate at the time the release was published. For the most current information about projects or programs, please visit the project or program Web pages. You may find those by searching by keyword in the search Virginia DOT box above.

Page last modified: Oct. 27, 2023